Exfo FTB-2 User Manual Page 278

  • Download
  • Add to my manuals
  • Print
  • Page
    / 443
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 277
Maintenance
268 FTB-2 and FTB-2 Pro
Installing or Removing the Power Meter and VFL
7. By holding the power meter by its faceplate, position it so that the
writings are right-side up.
8. Carefully align the power meter with the corresponding bay.
9. Gently slide the power meter into the bay until its faceplate is flush
with the edge of the bay. As the power meter reaches the back of the
bay, you should feel a slight resistance, indicating that it is properly
connected inside the unit.
Note: If the power meter slides all the way into the bay without any resistance, it
probably means that it is not properly inserted.
Writings
Page view 277
1 2 ... 273 274 275 276 277 278 279 280 281 282 283 ... 442 443

Comments to this Manuals

No comments